compass-header1

Finishing Touches

Posted on Wed, Apr 8, 2015

We have officially entered the “finishing touches” phase of the Hunt 80 build. With major construction complete, the focus now is on finishes, and that means varnish- lots of varnish. The teak finishes in the main salon, galley and enclosed flybridge are looking shinier by the day!

Read More

Building the Hunt 80: Waterjet Installation

Posted on Wed, Dec 10, 2014

The first of two 1,600 hp, 10-cylinder, 6,000 lb. MTU 10V2000 M94 diesels being lowered into the engine room on the Hunt 80 through the aft deck hatch opening.
Read More

Building the Hunt 80: Form and Function

Posted on Wed, Nov 12, 2014

Pure functionality is evident everywhere onboard the new Hunt 80, including the ergonomically laid out galley. Located forward to port inside the main deck salon, the galley is adjacent to the dining area. When finished, in addition to the excellent view through the large deckhouse windows, it will have a full enclosure with an aft-facing opening toward the salon and a sliding door leading to the formal dining table to starboard. A door just aft of the galley leads directly to the weatherdecks, or opens to let in a little seabreeze as needed.

 

Read More

It’s Out of the Mold - Hunt 80 Sport Motoryacht

Posted on Wed, Jun 18, 2014

Read More